PUBLICATION BULLETIN

Active MODIFICATION NOTES

NWS NUMBER TITLE EFFECTIVITY
165 Removal of FSP Dual Polarization Ladder Bars *
182 REPLACEMENT OF TRANSMITTER CIRCUIT CARD REPLACEMENT OF TRANSMITTER CIRCUIT CARD ASSEMBLY AND TRANSMITTER BACKPLANE *
184 Installation of New SCR Modulator Switch *
189 Refresh of RPG Console Server and Installation of Software Build 18.0 *
190 GPS, SURGE PROTECTOR, AND GPS ANTENNA REPLACEMENT *
192 Installation of Transmitter Oil Pump Modification *
194 REFURBISHMENT OF NEXRAD TRANSMITTER (UD3) *
A1 TO 194 Refurbishment of NEXRAD Transmitter (UD3) *
199 NEXRAD Frame Relay Hub Router Replacement at Guam WFO Guam
200 Decommission of Large and Small OPUPs  
202 REPLACEMENT OF RDA LAPTOP *

As of Monday, September 17, 2018